- How many dry mils and practical gallons per square are required for a 15-year U-701 restoration over aged tpo single-ply roof?
- This 15-year assembly delivers 28 continuous dry mils (DFT) across warranted membrane coats and requires 3.19 practical gal/sq total across prep, primer, and finish coats—accounting for the +5% roughness/porosity factor of aged tpo single-ply roof and 72% volume solids of U-701.
- How does this specification resolve thermal shock & hail impact without tear-off?
- Dark metal and bituminous roofs exceed 165-185 F in summer sun and plummet 60-80 F within minutes during convective storms, generating intense dimensional contraction stress. After confirming wet insulation is below 15% and achieving at least 2 lbs/linear inch ASTM D903 peel adhesion, crews follow: Agitation-scrub oxidized chalk film with RP-100 ProWash and rinse clean, probe all heat-welded seams, run ASTM D903 field adhesion peel tests (minimum 2.0 pli), and prime with P-301 Multipurpose Primer where substrate surface energy requires adhesion promotion.
- What Graco spray rig, tip size, and dew-point rules govern U-701 on this assembly?
- Specify Graco GH 300, Graco DutyMax GH 300DI, Graco GH 733 at 2500-3500 PSI with 1/2 in ID x 150 ft solvent-rated PTFE-lined hose, Graco XTR-5 / XTR-7 Solvent-Rated Airless Gun, and .021-.027 fine-atomization reversible tips. Maintain minimum ambient 40 F and >=5 F dew-point spread (pre-heat drums below 55 F).
- Does this assembly comply with US Federal EPA AIM National Rule (40 CFR Part 59) and ASHRAE Zone 2A codes?
- Yes. U-701 measures 220 g/L VOC within the 250 g/L limit for US Federal EPA AIM National Rule (40 CFR Part 59). Eligible restorations over dry substrates qualify under the IBC Two-Roof Rule.
- How do commercial owners and CFOs evaluate CapEx, insurance, and 2026 tax treatment for this restoration vs. tear-off?
- From a multi-brand asset-management perspective, qualifying fluid-applied restorations avoid 39-year straight-line tear-off depreciation—often qualifying for Year-1 IRC Tangible Property Regulations maintenance expensing, 2026 IRC Section 179 QIP caps, and permanent 100% Bonus Depreciation (noting IRC Section 179D is terminated under PL 119-21 for starts after June 30, 2026). Verified commercial contractors can benchmark reference assemblies (Founding Vendor: KoolCoats) and build trade quotes at portal.topcap.ai.