- How many dry mils and practical gallons per square are required for a 10-year TS-513 restoration over r-panel metal roof?
- This 10-year assembly delivers 23 continuous dry mils (DFT) across warranted membrane coats and requires 5.49 practical gal/sq total across prep, primer, and finish coats—accounting for the +12% roughness/porosity factor of r-panel metal roof and 33% volume solids of TS-513.
- How does this specification resolve rusted fasteners & seams without tear-off?
- Thermal expansion and contraction of metal panels elongates screw holes, crushes neoprene washers, and opens capillary water paths that accelerate galvanic and atmospheric steel oxidation. After confirming wet insulation is below 15% and achieving at least 2 lbs/linear inch ASTM D903 peel adhesion, crews follow: Tighten or replace backed-out fasteners, pressure wash at 2500-3500 PSI with RP-100 ProWash biodegradable degreaser to remove chalk and mill oils, wire-brush loose scale, and spot-prime active red rust with P-309 Rust Converter Primer before seam reinforcement.
- What Graco spray rig, tip size, and dew-point rules govern TS-513 on this assembly?
- Specify Graco GH 200 (1.0-2.0 GPM), Graco GH 300 (1.5-2.5 GPM), Graco TexSpray Mark V / Mark X at 2500-3000 PSI with 1/2 in ID x 150 ft airless hose, Graco Silver Plus / Contractor PC Airless Gun, and 629-633 (.029-.033 reversible) tips. Maintain minimum ambient 50 F and >=5 F dew-point spread (pre-heat drums below 55 F).
- Does this assembly comply with US Federal EPA AIM National Rule (40 CFR Part 59) and ASHRAE Zone 1A codes?
- Yes. TS-513 measures 48 g/L VOC within the 250 g/L limit for US Federal EPA AIM National Rule (40 CFR Part 59). Eligible restorations over dry substrates qualify under the IBC Two-Roof Rule.
- How do commercial owners and CFOs evaluate CapEx, insurance, and 2026 tax treatment for this restoration vs. tear-off?
- From a multi-brand asset-management perspective, qualifying fluid-applied restorations avoid 39-year straight-line tear-off depreciation—often qualifying for Year-1 IRC Tangible Property Regulations maintenance expensing, 2026 IRC Section 179 QIP caps, and permanent 100% Bonus Depreciation (noting IRC Section 179D is terminated under PL 119-21 for starts after June 30, 2026). Verified commercial contractors can benchmark reference assemblies (Founding Vendor: KoolCoats) and build trade quotes at portal.topcap.ai.